BS Part BS Part BS EN to 3 & 5 to 7: BS EN BS EN to BS EN Specifies two procedures for sampling fresh concrete: composite and spot sampling. Document History. Supersedes BS EN Related products by. said in BS EN , take a few samples throughout the pour for the best representation of the batch and make sure you take % of what you think you’ll .

Author: Daijora Samujora
Country: Mozambique
Language: English (Spanish)
Genre: Politics
Published (Last): 5 October 2009
Pages: 251
PDF File Size: 11.36 Mb
ePub File Size: 1.68 Mb
ISBN: 431-8-70291-672-9
Downloads: 57505
Price: Free* [*Free Regsitration Required]
Uploader: Shaktishakar

BS EN 12350-1:2009

To find out more, including how to control cookies, see here: Mechanical vibration with vibrating table Apply the vibration for the minimum duration necessary to achieve full compaction of the concrete.

Procedure for Slump Test Apparatus being readied for slump test activity Fill the mold in three layers of approximately equal height. Protect the sample from sun, wind, and other sources of rapid evaporation, and from contamination. Pack the hardened test specimens in wet sand or wet bs en 12350-1 or wet cloths wet burlapor sealed in plastic bs en 12350-1 containing water.

Disregard the first part and the last part of the load and take at least 4 increments. Now, if the placement of concrete goes beyond these waived time limit, the concrete should be rejected. This is a very classical question raised by many graduate engineers.

bs en 12350-1

Both parties will agree to the specific time limit as substantiated from the concrete design mix. This site uses cookies.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

The report shall include: Menu Home Blog About Contact. The vertical distance between the height of the mould and the highest point is measured and recorded as the slump in mm.

Bs en 12350-1, especially for big projects where a large quantity bs en 12350-1 concrete is cast, both parties come up with the designed mix and validated through trial mixes to compensates for this particular problem. Concrete having coarse aggregate up to 40 mm in size.

BS EN – Testing fresh concrete. Sampling – BSI British Standards

What is the frequency of Sampling of Concrete? Minimum size of sample x 1.

The elapsed time shall not exceed 15 min. Procedure Place the TMD in the concrete so that the sensing portion is submerged a minimum of 75 mm. I have a presentation bs en 12350-1 week, and I am on the look for such info.

Click to learn more. Notify me of new comments via email.

The first school of thought is rather straightforward: Gently press the concrete around the TMD at the surface of concrete so that bs en 12350-1 ambient temperature does not influence the reading.

When mixing and sampling of concrete is done in a laboratory, different procedures may be required. Raise the mold carefully in a vertical direction with no lateral or torsional motion Raise the mold in 2 to 5 sec. Find Similar Items This product falls into the following categories. The mold is raised and the concrete allowed to subside. Sampling of fresh concrete at site.

Subject the concrete bs en 12350-1 a sufficient number of strokes per layer, typically If a falling away or shearing occurs, disregard test and make a new test using another portion of the sample. Pressure methods BS EN Quantity at least 1. Difference of the two samplings — Composite sampling is more diverse as it is the representative of the whole truck bs en 12350-1.

Due to the shape of the mold, the rod must be inclined in first layer while rodding around the perimeter of the cone. Contents of BS EN